Registered Company Data Sheet Performance
Summary
Password Required
Company
Name
UKR Ltd
Reg No 020
AddressRyder Close
Appleby Gate Industrial Estate
Swadlincote
Derbyshire
DE11 9EU
Tel01283 554880
Fax01283 554881
Emailken@u-k-r.net
Websitewww.u-k-r.net
ContactKen Burden (Commercial Manager)
Company Summary
UKR have been established 10 year and in that time have grown from an annual turnover of £750,000 in our first year to a projected turnover for our current financial year of £33,000,000.

This growth has been achieved by the company’s total concentration on our basic core values of safety, value for money, quality and inward investment.

During our ten year we have constructed all types of reinforced structures. Contracts including 50 water treatment works throughout the country, major bridge contracts and multi storey frames for both residential and commercial developments.

The company has considerable experience in the use of specialised construction methods and has carried out many contracts using slipform and tunnelform procedures on silos, complex cores and hotels.

For more information please visit our web site www.u-k-r.net
Scope of Activities Covered by Specc
Activity In-Situ Precast
Concrete Frame
& Major Works
YN
Basement
Major Construction
YN
Basement
Residential Only
NN
Concrete Barrier
(Slip Form)
NN
Piling
 
NN
Flooring
 
NN
Other Activities undertaken
Activity Performed Direct Subcontract
Precast NNN
Demolition NNN
Piling NNN
Flooring NNN
Drainage YYN
Earthworks YYN
Tensioned Concrete YNY
Structural SteelworkNNN
Civil Engineering NNN
Regions
Area Y/N
SE England Y
SW England Y
East England Y
West Midlands Y
NE England Y
NW England Y
Wales Y
Scotland Y
N Ireland N
Overseas Y
Contract Sizes
Value Y/N
less than £250kY
less than £500kY
less than £1M Y
less than £2.5MY
less than £5M Y
less than £10MY
more than £10M N
Human Resources
  Snr Mgmt Comm -ercial Tech Admin Site
Direct 48202 
Contract     
Trainees2    
Total 68202170+
Specialist Plant & Equipment Owned
SGB Logic 60 Vertical Formwork System
ISCHEBECK TITAN horizontal Formwork System
Fleet of 14 No. Concrete Pumps
Numerous site tools etc.
Design Capability
Design work is subcontracted via the Formwork provider and includes all Permanent and Temporary works.
IT Network Services
Location/Other Y/N
Internal Depts Y
Head Office Y
Regional Office N
Construction Sites N
Customers/Clients N
Designers N
Suppliers N
IT Managed Process
Process Y/N
Project Planning Y
Design N
Progress Control N
Estimating N
Accounts/Costing Y
Quality Planning/Control N
Health & Saftey N
Procurement N
Archiving N
Quality, Health & Safety
& Environmental Control
Company System Spec Registration
Technical
Requirements
Quality Y
H&S Y
ENV Y
Back Click HERE for printer friendly version SpeCC Logo
Information may only be downloaded for reference purposes pertaining to the SpeCC Scheme, and may not be edited, re-created or re-produced for publication in electronic or hard copy format without the express permission of SpeCC Limited.
 
Information may not be downloaded directly to a third party web site without the express permission of SpeCC Limited